Store Front. (pre-construction start)
View of store front from inside. (pre-construction start)
Future playground area...(pre-construction start)
Another look at future playground area. (pre-construction start)
Back end of playground area, the pond, trees, etc... all need to be removed to create the play area. (pre-construction start)
Interior, just inside front door. The daycare is 110 ft deep by 50 feet wide (~5500 sq ft total). (pre-construction start)
Another look at the store front. Our sign will go on the vertical wall area above the silver car. (pre-construction start)
Building owner and myself discussing play area layout. (pre-construction start)
Windows, and future site of exit doors for the 6 week-24 month room & age 2-3 room. There will be a wall separating these two rooms. (pre-construction start)
Another front door look. (pre-construction start)
Shared wall with store next to us. Dirt floors in the center, so we don't have to rip out a bunch of concrete to install the plumbing. :) (pre-construction start)
Rough in Plumbing - End of First Week of construction
Plumbing Inspected & Concrete Floor Poured - End of Second Week